by Liz Mason on August 22, 2012 Tags: Easy Organizing, Goals, Organizing for Life, Personal Organizing, Setting Goals Comments: 0
What projects have you left unfinished?
Did you finish the last book you started reading? What about those unfinished projects that are lurking in the back of your head causing you more stress than they are worth? We have become a society of starters and not finishers. Whether it’s a lack of commitment, lack of energy or just a plain ole lack of interest we seem to burst out of the gates with great enthusiasm but rarely end that way. Finishing can be your new song and dance with a little help you will get there.
To “Get Organized” you need a plan. 1, 2, 3 Finish!
Let’s start by making a list of what God told you to do days, weeks or months ago. Write down all the things you’ve been putting off. Okay great! Let’s dig in; it’s time to get it together.
1. Choose the top 3 things you want to accomplish from your list.
2. Now decide on a dateline for each of your goals, this is better known as a deadline but I prefer to keep it positive.
3. Break your goals down by writing smaller goals on a calendar. If you determine it is going to take you three weeks then decide on which of the smaller tasks you will complete on each day leading up to your set dateline.
If you enjoyed this article please post a comment!
Thank you for stopping by… Liz Mason
Organizer serving Maryland, Washington D.C. and Virginia
by Liz Mason on August 3, 2012 Tags: Organizer in Maryland, Overwhelmed, Professional Organizer, Time Management Comments: 0
Take advantage of today! Are you sometimes overwhelmed at the mountain of unfinished projects lurking in the back of your mind? Do you have a list of lists and not enough time and energy to see them through to completion? Perhaps it’s because you let things pile up. You’ve been meaning to go through the mail and you meant to clear out the junk drawer days ago. The problem is that you keep letting stuff pile up and nothing seems organized.
Life can be difficult enough with that entire list of daily “must dos.” Then your “should dos” and “want to dos” become even more overwhelming. It’s not easy to keep moving when little sleep and too much running around is what got you here to begin with. STOP and ACKNOWLEDGE the error of your ways. Procrastination has beaten you down and now you’d rather be raptured out-of-here than to confront your mess. You are not alone in your dilemma to find the light at the end of your piles and get organized.
Organizing is fun! Here are a few practical tips to get this party started and get your life back on track. No one wants to live an overwhelmed and disorganized life with no hope of recovery. These simple steps will help you to dig out, but one last thing you must promise to do: Maintain what you gain. There is no point going though all the persistent work it takes to get your home or office in order if you’re only going to end up defeated by the clutter once again in two months.
Step #1 Pick a day of the week when you will give yourself at least a couple of hours which are dedicated to nothing other than organizing and maintaining your accomplishments. Mark it on your calendar for the next 60 days.
Step #2 Decide on which organizing project will have the most impact. Then make it a date. If you lack motivation enlist a friend or relative for support. Report to them when you are planning to start and ask for accountability. Let them know when they should check in to see your completed project. You’ve picked your date, now it’s imperative that you stick to it.
Step #3 Start small by making a list of all the mini projects that it will take to accomplish the “big picture” project like having the entire office neat and organized. Decide on your top 3 mini projects. Mark each of them on your calendar and assign a realistic time frame for completion.
If you need more help getting started (enter your info. at the top of this page) to download my FREE eBook 7 Fearless Steps to Simplify Your Life which will help you sort through all the challenges of getting things done.
Enjoyed this article? Please post a comment!
Thank you for stopping by… Liz Mason
Organizer serving Maryland, Washington D.C. and Virginia
by Liz Mason on July 19, 2012 Tags: Converting Closet, Get Organized, Office Organizing, Office Storage ideas, Organized Office Comments: 0

1. Remove everything from the closet. Relocate clothing or other items being stored in the closet.
2. Measure for shelves. Make sure top shelf is half the depth of the closet to ensure you can use the full height of the space above the door header.
3. Remove existing shelves, rods or brackets and hardware. Patch up any holes, sand and prep walls for paint or wall paper.
4. Select colors for walls and choose matching storage accessories for magazines, paper and office supplies.
5. Paint or wallpaper walls and install adequate lighting.
6. Install brackets and shelves. Adjustable shelves work great and allow you to change spacing to accommodate accessories, books, supplies and storage containers.
7. Add a chair and wastepaper basket to complete the look and functionality of your new office.
Simplify Tips:
- Install a desktop shelf that is the full width and depth of the closet space. This allows you to utilize the entire space for your desk accessories, computer and writing space.
- Consider leaving 18-20 inches above the desktop shelf. You can use the wall space for an ideas board, wall calendar and magnetically attached office supplies.
- Leave doors on closet; when your office is not in use you can close doors.
If you enjoyed this article please post a comment!
Thank you for stopping by… Liz Mason
Organizer serving Maryland, Washington D.C. and Virginia
by Liz Mason on June 21, 2012 Tags: Achieving Your Goals, Goals, Maryland Organizer, Organizer, Organizer Liz Mason, Setting Goals Comments: 0
Goal setting is an important part of living a productive life.
Goal setting is considered one of the top common attributes of successful people. Having godly goals allows you to openly express where you are headed. If you have no idea where you are headed how will you know when you get there? Your goals will organize and stretch your ability to follow through and stay focused.
Consider the cost before setting goals.
Jesus gave two great examples of counting the cost of our goals. (Read Luke 14:25-33) Before you set goals it’s important that you consider whether you are able to achieve them, but also determine if you have what you need to finish. If you find that you are not fully prepared to accomplish your goals then set stepping stones toward reaching your goals. An example would be: You want to start a school for underprivileged girls. You realize that in order to teach you will need to further your education. You haven’t completed your degree; therefore a stepping stone toward accomplishing your goal would be to return to school and finish your last year to get your degree. Make a list of the costs involved in achieving your goals.
Build into every goal your plan for celebrating success.
I call this giving yourself a carrot. Having something to look forward to, other than achieving the goal itself is another way to support your success. You’ll have something special to look forward to as a reward for all your hard work once you’ve accomplished your goal.
Stay focused on your GOAL.
It is vitally important that you write your goals and review them regularly. There will be many distractions that will cost you a great deal of productivity if you allow yourself to constantly be distracted. The entrepreneur is especially vulnerable to this because you are usually a very creative person with great initiative. Your leading edge is often your ability to create, organize and develop. Keep your focus by having a vision board and a written set of goals that you review daily. Your goals are not your “To Do” lists. Your goals are what you hope to accomplish by finishing what’s on your “To Do” lists. Remember to guard against distractions that deter your efforts to reach your goal.
Read this article: God-given Goals Lead to Success
Download a FREE printable for simple steps to set goals.
If you enjoyed this article please post a comment!
Thank you for stopping by… Liz Mason
Organizer serving Maryland, Washington D.C. and Virginia
by Liz Mason on June 14, 2012 Tags: Fairfax Virginia, Recycling, Shred Event, Shred Papers, Shredding Comments: 0
GET ORGANIZED NOW!
Free Community Shred Event
Saturday, June 16, 2012
8:00-11:00 a.m.
Annandale campus of Northern Virginia Community College
Cars must be in line by 11 a.m.

Sponsored by: NBC4 & PNC Bank
Up to five banker boxes of personal papers
and mail (per vehicle)
This shred event is great for the environment!
All paper received is recycled.
Please sort through your papers and remove binder clips, paper clips and rubber bands. This event is for paper shredding only. Review list below for items that are not allowed. Get directions to FREE SHRED EVENT.
Items NOT allowed: Batteries, Binders, CDs, Combustibles, Credit Cards, DVDs, Electronic Equipment, Flammable Materials, Hanging Files. Please only PAPERS.
by Liz Mason on May 28, 2012 Tags: Office Supplies Storage, Office Supply List, Organized Office Inventory Comments: 0
5 Simple Steps to Keep Your Supplies Neat

organize tiny supplies in baking cups
1) Organize an inventory system by keeping a list of office supplies.
• Know what’s on-hand.
• Know what to reorder.
2) Keep small items neatly organized together. Projects shown use existing household items to organized small office supplies.
3) Organize frequently used items either on desk top or keep within arm reach. You won’t want to get up from your desk to staple papers or to use scissors.
4) Organize large office equipment neatly on a craft or project table. Store office equipment so that it’s accessible; this way you won’t need to pull out your equipment each time you need to use it.
5) Keep your supplies organized on open shelves for easy access. If you choose to use storage containers, select the type without lids. Make the task of taking your office supply inventory simple by storing your supplies in an open space.
Organized Office Inventory Checklist
FREE printable download
by Liz Mason on May 15, 2012 Tags: Organizing Smart Phone Comments: 0
Organizing Your Smart Phone With Android Applications 
Free Organizing Apps-My 5 Favorite
Color Note – Speak into your phone and make your “To Do” list fun. You can change the color of each list and checkoff items that have been completed.
Mobile PDF – What better way to keep prescription lists, passwords, or other important information like free PDF organizing tips from Let’s Get It Together Resource Page. You can email your PDF to yourself and once you open it on your smart phone you can save it. Make sure you put a coded lock on your phone for security reasons.
YouVersion – Holy Bible application is great for finding scripture on the go. Get a free account and you can organize a program schedule for reading your bible. The live chat feature allows you to interact with church services by following along with the message and ask questions anonymously. The share button allow you to pass it on to your friends for easy download to their smart phone. This great app also has a note taking area to help with your study time.
QR Droid – Gives you full capability to scan in-store QR Codes. Get free coupons, discounts and special offers long with other product information; it’s as simple as taking a picture.
Simple Shopping List – Create different shopping list for your favorite stores. Select the “Go Shopping” feature and your full list for that store will display on full screen for one touch check-off.
BONUS: Lookout Security & Antivirus – Will make your phone scream if it is lost or stolen. This feature works even if your phone is on silence. This will locate your phone if it is within a certain mile radius.
by Liz Mason on May 12, 2012 Tags: Busy Schedule, Scheduling, Time Management, Utilizing Your Time Comments: 0
Learn To Say “No” Without The Guilt
Effective time management requires you to have a schedule that works. Your schedule should support your values. Organizing your schedule will keep you from over committing. Sometimes it’s hard to tell a friend in need that you’ll be unable to help with their current project. You must be kind, but firm if you plan to keep your schedule from overwhelming you and manage your time. 
It’s alright to say no
Learn tips to make it less difficult; there are ways to say “no” in a manner that is positive. Express your appreciation for being considered for the opportunity, but gently explain that you will have to decline this time. Practice this suggested response and be ready to be honest about your ability to commit to taking on additional responsibilities.
Thank you so much for thinking of me, it sounds like a great opportunity to help out. I’ll have to check my schedule and see if I can make the commitment this project is going to require.
Tips on how to say no
- Be careful to monitor your tone, and make sure your attitude is one of gratitude that you were being considered for the task. Be humble and considerate of the person who really needed your help.

Humble not guilty!
- When saying “no” be assertive not aggressive.
- If you know someone else who would be great for the project and may have time, suggest an alternative for the project.
- If you have other commitments, giving a reason is considerate.
- Be respectful and polite when declining to participate.
- If you find the task interesting and would like to participate in a similar project at a later time, let the person know that it’s okay to ask you again if another similar opportunity comes up later.
- If you can negotiate time or specifics, be open to the idea. Negotiate your role and your level of participation when possible.
Organizing your schedule by following these helpful tips will support your values. Effectively managing your schedule includes being willing to say “no.” Stop feeling guilty and eliminate the frustration caused by a cluttered schedule.
Download FREE printable tips on how to
Stay Organized – Saying No For The Right Reasons.
Excerpt from 7 Fearless Steps to Simplify Your Life
Get Free Full Color Workbook
Enter your name and email address for the PDF printable link.
by Liz Mason on May 10, 2012 Tags: Morning Checklist, Organized Morning, Start Morning Comments: 0
Organizing A Stress-Free Morning Begins The Night Before
I’m really running late again. If this is the way you begin your morning, then you are already off to a stressful start. Spending your morning running around is no way to have a successful and productive day. Organizing ahead will enable you to take a quiet moment to breathe and invite the Lord to guide your footsteps for the day. Try these ideas to begin your day with better focus and stay organized.
Organizing Tips To Make Getting Ready Simpler
1. Organize and prepare lunches and snacks the night before. Keep plastic ice cubes organized in separate Ziploc sandwich bags in the freezer. In the morning you will only need to drop the entire bag in each insulated lunch bag.
2. Press clothes, uniforms, etc. the day before. Also decide on which shoes you’ll wear.
3. Organize important last minute items near the door. Here’s a list of things you may want to keep near the door: keys, umbrella, planner, cell phones, extra pair of flats, tote bag, and any outgoing packages or mail.
4. Set an egg timer or alarm clock (you can use your cell phone) near the door. Set your alarm to ring 10 minutes prior to time to leave. If you leave at approximately the same time each day, set your alarm to automatically repeat weekdays.
5. Laminate your checklist and keep it in a drawer or post it on the wall near the door. Check to make sure you organize everything you’ll need the night before.
6. Organize in the car any dry cleaning that you need to drop off, the evening before.
7. Make sure you go to bed early enough, so you have a fresh start the next day.

8. Organize breakfast by making your favorite egg sandwiches and wrapping in foil pockets. Then label and place them in the freezer. Also organize fruit cups for the week. Place your breakfast pockets in the oven on 200° when you first wake-up. It should take about 30 minutes to warm. Since it’s wrapped and ready to go, you can take it with you to save time. Sunday night is perfect for making sure your prepared breakfast pockets for the entire week are organized.
9. Set the coffee pot with timer, so that your coffee is ready when you wake-up. Pour creamer and sweetener in your travel mug to save time on prep work in the morning.
10. If you are going somewhere you haven’t been before, program the address in the GPS the evening before. This will also give you the travel time and distance so your trip will be organized.
Organizing Checklist download a FREE copy and keep it near the door to ensure your morning is organized.
by Liz Mason on May 9, 2012 Tags: Busy Moms, Busy Schedule, Disorganized, Distressed, Get Organized, Overwhelmed, Priorities Comments: 0
Organizing Priorities Begins With A Simple Reality Check.
You are so extraordinary, you really know how to live life to the fullest,” your friend gushes. Your hard work and dedication as a ministry leader, entrepreneur, Neighborhood Yard Committee chairperson, Chamber of Commerce board member and car pool organizer has earned you the admiration of many young moms and execs alike. You admittedly love the accolades of being seen as the one who can do it all. Not a single day goes by when your three girls’ hair isn’t adorned with pink or yellow ribbons and they each sport matching tees. You love what you’re able to accomplish in any given day, but the stress that goes with it is starting to affect your health. 
Getting priorities in order is no longer negotiable. Your recent acknowledgement that you almost fell asleep while driving was a wake-up call. Finally you’re ready to admit that having a full schedule with “superwoman” level commitments doesn’t make for a very fulfilling life. Your responsibilities often keep you away from what really matters, family. Suddenly you realize the trade-off is not what you want. The stress your body feels is telling you it’s time to set some limitations. The still small voice of the Holy Spirit has been urging you to slow down. Now you admit it’s high time you listen and organize your priorities.
Organizing your priorities, will eliminate stress.
God has blessed you with great talents, abilities, gifts and skills, but He never intended for you to take on the coveted role of “superwoman.” You’re using your TAGS to fulfill God’s plan for your life and you do well in serving others. There are however, limitations that must be set. Based upon your values and the life you want to live, being overwhelmed and distressed isn’t part of the program. Here’s a simple exercise to help you hone in on what’s important, get organized and start to honor the values you truly want to embrace.
http://tinyurl.com/whats-on-your-plate
If you prefer download the complete full color workbook for free.
Enter your name and email address in top right corner for instant download.
by Liz Mason on April 14, 2012 Tags: Improve Productivity, Organizing Tips, Reduce Stress, Utilizing Your Time Comments: 0
Stop Chasing Time and Be More Productive
The kids riding in the backseat ask, “Are we there yet? Are we there yet…?” At least half a dozen times you answer no. Somehow the short ride to Grandma’s house seems miles further than over the mountains and through the woods. Why is everyone so hard-pressed for time? We wait in line at the grocery store asking the rhetorical question, why did all these people choose to come to the grocery store the same time I did?
Today as I waited for my car to be serviced. I felt less patient than ever. More pressed, more and more stressed, reminiscent of sitting in the waiting room at the dentist’s office dreading the dental assistant’s overly kind and friendly voice saying, “Ms. Mason, right this way. ” “The doctor will see you now”. Will I have to pay half a weeks salary for repairs today. After all I’ve been driving with that light flickering on and off for three whole days now. It’s probably just a glitch in the intel-system. They’ll just hit a button to reset the thing and I’ll be on my way.
The service manager himself comes out with a blank stare that caused me to clutch my checkbook so tight my fingers started to feel numb. “Ms. Mason that will be $19.95 plus tax for your oil change.” I held my breath to see what other surprises he had in store for me. No charge for the part we had to replace it was under warranty. He said, “you can see the cashier on your way out.” My car was clean and sparkling as it waited for me to hop in. I breathed a sigh of relief and realized all the checkbook clutching and root canal flashbacks were far too dramatic for a trip to the dealership service center.
Read the rest of this entry »
by Liz Mason on April 12, 2012 Tags: Organizing Office Spaces, Organizing Solutions, Organizing Tips Comments: 0
An Easy Mail Management System You Can Start Today
Here’s what you’ll need:
- Mail in and out box
- 3 file folders/desk trays
- Calendar/To Do List
- Shredder
- Wastebasket
Every piece of paper you have will fit into one of four categories: Do, Read, File or Trash
1. Mark on your calendar which days are mail days. If you get a lot of mail this would be at least twice per week. TIP – Leave the mail in the mailbox until mail day. Unless you are expecting a huge inheritance check there is probably no overwhelming reason to pick up the mail every day.
2. When your mail first comes in you will act upon it. All incoming mail goes into the “In box” which is to be sorted the same day.
3. Ready to sort? This is where your three file folders come in. These are “action files” so label each folder for action! DO, READ, and FILE.
4. Open your mail and act upon it. If you receive an invite to a party, mark the date on your calendar and place it in the “do” folder. You’ll want to respond as soon as possible. Once completed set it in the “out” box. Keep a book of stamps handy in your out box. A letter or an article you want to keep should be placed in the “read” folder. If it is something like a recipe sent by a friend, it goes in the “file” folder. Write a reminder on your calendar or to do list to send a thank you card.
5. Get rid of all trash immediately. If it is something you know you don’t need trash it right away. If it has personal information cut that part off and shred it.
Putting these few simple steps in place can make managing your incoming mail easy and less time consuming. Remember don’t let your mail pile up deal with it as soon as it comes in. For product information on desk trays from See Jane Lead click image.
by Liz Mason on April 5, 2012 Tags: Organizing How To, Organizing Tips, Organizing Your Handbag Comments: 0
How to Organize Your Bag Once and For All
Here’s what you’ll need:
- 20 minutes
- large table/floor space
- trash can
- shredder/scissors
- your handbag or briefcase
- cold sparkling cider
1. Empty your bag onto the table. Group like items together separate and organize cosmetics, writing tools, credit cards, receipts and papers.
2. Throw out the things you don’t need or use. Get rid of things like old gum, stale mints, cracked makeup, expired medications, old business cards, scratch pieces of paper. Shred any receipts, bills or papers with sensitive personal information.
3. Compartmentalize your things. One of the most effective ideas on handbag and briefcase organization must be credited to Hillary Clinton. She uses inner mesh bags to keep like items together. When its time to change your bag you just move the mesh bags to the other purse. There are different types of purse organizers available for less than $30.
4. Organize everything neatly. Organize and put back into your bag, keys, glasses pen, lipstick and eyeliner. Only return those items to your bag that are essential. Look for ways to save space like putting your makeup on before you leave the house, so there’s no need to carry all of it.
Take your junk bag to a new level.
Read the rest of this entry »
by Liz Mason on March 28, 2012 Tags: Conquer Clutter, Find Motivation, Get Organized, Getting Started, Stop Procrastinating Comments: 0
Getting started can be the hardest part of getting organized.
Do you lack motivation and find the most difficult thing about organizing is getting started? Procrastination and fear are the two power twins that seek to render you powerless and defeated by your ever-growing piles of mess. Don’t be discouraged, help has arrived. THERE’S HOPE!!!
7 quick things you can do to conquer your clutter now.
- Enlist a friend or a professional organizer to help you dig in.
- Get your calendar and schedule 3 separate organizing sessions. If you have a lot of clutter you may need to schedule up to 5 sessions but almost any amount of clutter can be eliminated in that amount of time. Make each session 2-3 hours in length. Plan carefully and use INK. Keep in mind you must prepare and condition yourself. One would not attempt to climb Mount Kilimanjaro in an hour or a day. Let’s face it you’ve been accumulating stuff for a while, so it’s going to take some time to get things organized.
- Make a trusty “TO DO LIST” and make it specific. You must list out the things that you plan to get accomplished during your three organizing sessions.
Read the rest of this entry »
by Liz Mason on March 15, 2012 Tags: Reduce Stress, Time Management, Utilizing Your Time Comments: 0
Why are some people always late?
People who are habitually late consistently fail to respect time. Having respect for time is about realizing the value of it; it is a precious commodity. You don’t get any more or any less than everyone else. It is measured the same for each of us and your allotment of “time” must not be taken for granted. RESPECT time and it will work for you. DISrespect it and you will end up chasing it to get caught up.
Have you ever been late for work or for an appointment because your perception of time was wrong? This is how you know; you think you have time to take on tasks that you actually don’t. You wake up at 6:00 a.m. and you need to be in the office by 9:00 a.m. You perceive you have time to knock a few things off your “To Do” list. So, you put in a load of laundry, mop the kitchen floor and send out three birthday cards, therefore stopping at the post office on your way in. Yet once you’ve completed the first two things on your list you realize you didn’t allow time to get dressed.
It’s 7:40 and you must be out the door by 8:05 or you’re going to be late. You get dressed, it’s now 7:55. No makeup save 5 minutes, no Starbucks save another 10 minutes. By way of deductive reasoning you now have convinced yourself that you still have time to stop at the post office to buy stamps for those b-day cards. It’s 8:25 and you’re in your car only to realize you need to stop for gas! You are now looking for someone to point the finger at. Who will get the blame today, traffic, gas, time? No, you decide to blame your job; “If I didn’t have to report to prison today, I’d have the time I needed to get things done.” That’s it blame work, something has to take the blame for your tardiness (again today). The truth is you failed to respect time again!
Recognize you have 24, only 24 hours a day, no more no less and guess what… it keeps moving no matter how much money you have; no amount of money will buy you more time. You may as well learn to respect it. Just admit it, it was unrealistic from the very beginning that you thought you could get all those things accomplished. If your life was a soap opera then you probably would have time to get dressed, (looking like you’re going to the club instead of the office) and visit your sick cousin; and then accomplish five things on your “To Do” list before going to work. This simply is NOT REALISTIC. When you were laying in bed to get that extra 10 minutes while figuring it all out – you knew you’d be hard pressed for time, but you made a decision to dis time again.
Read the rest of this entry »